Days Typical frame erection time for prefab Kerto LVL structure
|
±1 mm Dimensional tolerance across all structural members
|
Zero Shrinkage cracking — dimensionally stable after installation
|
CE Marked
|

Days Typical frame erection time for prefab Kerto LVL structure
|
±1 mm Dimensional tolerance across all structural members
|
Zero Shrinkage cracking — dimensionally stable after installation
|
CE Marked
|

On a traditional timber frame build, a significant proportion of site labour goes into dealing with material variation — straightening joists, shimming headers, fixing components that have moved since delivery. Kerto LVL eliminates most of this. Manufactured under controlled factory conditions, it arrives on site straight, dry and to dimension.
For house builders specifically, the slimmer wall profile that Kerto LVL T-studs enable translates directly into more saleable floor area. In a multi-apartment development, even 50 mm of additional interior width per room — across dozens of units — represents a meaningful commercial gain.
When Kerto LVL is used in prefabricated elements, the on-site programme compresses dramatically. Wall, floor and roof elements arrive complete and crane onto position in a single day, leaving your crews to focus on fit-out rather than frame construction.
House building
|
Multi-storey & commercial
|